Pasta Breakers for Re-Grind Systems 

         

Specially designed Dual Rotor Crusher for small batch long goods processing 

Hammer Mill for pre-breaking and re-grinding

 

 

 

All equipment is available in mild steel, 304 or 316 stainless steel

 

The pre-breaker bin is designed to start under a full load of product and reduce long goods for pneumatic handling or final regrinding.
Large inlet for easy loading
Heavy duty tube frame construction
High torque drive package with roller chain drive

 Send mail to garys@mpd-inc.com